Umgesetzte Investitionen

No.

Facility

&

Year of Work’s Completion

Investor

Boiler / Installation

Steam

output

(power of the boiler house)

Burner (s)

1

Steam Boiler House

1998

„Malta-Decor” A.G. Poznań

2x SEFAKO EOG 8 t steam/h
1x LOOS ZFR 28 t steam/h

44 t steam/h

WEISHAUPT

RGL 70

2

Steam Boiler House

1999

RUDAWA - DEKOR Rudawa

LOOS ULS 10000/13

10 t steam/h

WEISHAUPT RL 60

3

Steam Boiler House

1991

ZAKŁAD BADAWCZO ROZWOJOWY "POLMOS" Konin

BASOE Szwecja 6 t steam/h
SEFAKO E-125 3,5 t steam/h

9,5 t steam/h

POLMOR light fuel & mazout

4

Steam Boiler House

1994

WYTWÓRNIA WYROBÓW TYTONIOWYCH Poznań

2x LOOS ULS-4000

8 t steam/h

WEISHAUPT

RGL 60

5

Steam Boiler House

2005

„WYBOROWA” SA Poznań

2x LOOS ULS-3200/10

6,4 t steam/h

WEISHAUPT GL 40/2-A-TMD

6

Steam Boiler House

1998 & 2004

ZAKŁADY MIĘSNE "BARTEK" Sieraków + Ubojnia w Kłosowicach

LOOS ULS-3200/10                  2 x LOOS UL-S 1600/10

3,2 t steam/h          3,2 t steam/h

WEISHAUPT

RGL 40/2-A      WEISHAUPT

 GL-7

7

Steam Boiler House & proces steam

1998

HOCHLAND POLSKA
Sp. z o.o. Kaźmierz

LOOS ULS-2000/10
RUMIA - BASOE 100

3,0 t steam/h

WEISHAUPT G 7
OILON - gas

8

Steam Boiler House

1997

GMINNA SPÓŁDZIELNIA "SAMOPOMOC CHŁOPSKA" Czarnków

2x EKOMET Pleszew
KP 10/1100

3,0 t steam/h

WEISHAUPT G 7

9

Steam Boiler House

1995

OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Czarnków

2x CLAYTON EOG

3,1 t steam/h

CLAYTON

10

Steam Boiler House

1999

OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Chodzież

2x LOOS ULS-3200

6,4 t steam/h

WEISHAUPT RGL40/2-A

11

Steam Boiler House

1996

FABRYKA KSZTAŁTEK STYROPIANOWYCH PROFI-ENAMEL Wronki

LOOS ULS-2600

2,6 t steam/h

WEISHAUPT

GL 7

12

Steam Boiler House

2001

GORZELNIA Komorniki k/Tulec

LOOS UHD-3200

3,2 t steam/h

WEISHAUPT

 RG 8

13

Steam Boiler House

1993

OKRĘGOWA SPÓŁDZIELNIA MLECZARSKA Złotów

2x LOOS ULS-2600/13

5,2 t steam/h

WEISHAUPT

 GL 8

14

Steam Boiler House

1992

ZESPÓŁ SZKÓŁ ROLNICZYCH Poznań

VIESSMANN RU / ND
2x 1070 kW

1,2 t steam/h

KÖRTING VT-5

15

Water Boiler House

1994

AKADEMIA EKONOMICZNA Poznań

2x VIESSMANN Paromat Duplex

2140 kW

WEISHAUPT GL8

16

Water Boiler House

1994

PRZEDSIĘBIORSTWO PKS Poznań

2x VIESSMAN

Paromat Triplex

920 kW

WEISHAUPT G3

17

Water Boiler House

1992

POZTEL A.G. Poznań

2x VIESSMANN Paromat Duplex

740 kW

KÖRTING oil

18

Water Boiler House

1993

DRUKARNIA POZNAŃSKA Poznań

2x SCHAFER DOMOBLOCK

680 kW

KÖRTING gas

19

Water Boiler House

1994

Beiersdorf-Lechia A.G. Poznań

VIESSMANN Paromat Triplex

225 kW

KÖRTING gas

20

Steam Boiler House

2004 / 2005

Zakład Mięsny „SKIBA” w Chojnicach

LOOS U-DH 3200/10

I UL-S 1600

3,2 t steam/h

WEISHAUPT

 GL-7 gas/ oil

21

Steam Boiler House

2002

Zakład Mięsny „MATRO” Rawicz

1 x LOOS UH-D 1600/10

 

1,6 t steam/h

 WEISHAUPT 

oil

22

Steam Boiler House

2002

KRONOSPAN PL Szczecinek

1 x LOOS ZFR-IE 22000/20

22 t steam/h

mazout/oil/gas SAACKE typ SKV G60

23

Process installations

2001

LISNER Sp. z o.o. Poznań

frying installation based on boiler using heating oil

1400 kW

WEISHAUPT

 oil

24

Steam Boiler House

2001

ROLMLECZ Zakład Mleczarski w Poznaniu

2 x LOOS 2600

5,6 t steam/h

oil/gas WEISHAUPT

25

Steam Boiler House

2001

ICT Poland Sp. z o.o. Kostrzyn n/Odrą

2 x LOOS ULS- IE 14000

28 t steam/h

oil/gas

WEISHAUPT

WK -type

26

Water Boiler House

2001

Bazalt Wilków

3 x Euronox Torus

2 x600 kW

240 kW

oil - CUENOD

oil - WEISHAUPT

27

Process installation for waste neutralisation

2000

Zakład  Tworzyw Sztucznych. ERG Pustków

1x JUMEI 14 000

9 MW

gas SAACKE

28

Process installations

2004

Zakł. Chemiczne POLICE

Titanium white calcinating furnaces

2 x 13 MW

2x gas/oil SAACKE

29

Water Boiler House

2002

SEC Szczecin

LOOS UTH-Z 32500 MW x 2

65 MW

4 x SAACKE gas/oil

30

Process installations

2003

AMCOR RENTCH Sp. z o.o. Łódź

Thermal oil system .

Heat exchangers

-

-

31

Process installations

2003

NORDENIA Sp. z o.o. Dopiewo

Thermal oil system for printing machines, extension of the system in paint and solvent store

-

-

32

Process installations & Water Boiler House

2007

GESTAMP Polska Sp. z o.o. Września

Tłocznia blach karoseryjnych

LOOS UNIMAT UT 2500 x 6

Radiant heating system using water at 1200C as heating medium, cooling system for hydraulic & mechanical presses.

2650 kW

WEISHAUPT

G 9/1-D gas

 

33

Process installations & Water Boiler House

2007

GONVARRI Polska Sp. z o.o. Września

Krajalnia blach karoseryjnych

LOOS UNIMAT UT 1350 x 6

Radiant heating system using water at 1200C as heating medium.

1350 kW

WEISHAUPT

G 7/1-D gas

 

34

Steam Boiler House
&
Process installations

2006

POZNAŃ ONION Sp. z o.o. Siekierki Wielkie

LOOS UL-S 1600 x 18

Process steam system.

Heat exchanger vegetable oil/steam

1600 kg steam/h

WEISHAUPT

G 9/1-D-ZM gas

 

35

Process installations

2004

Zakłady Chemiczne LUBOŃ

Gas installation under control of The Office of Technical Inspection

-

-

36

Steam Boiler House

2004

„Delitissue”

Sp. z  o.o. Ciechanów

 

LOOS UL-S 16000 x 20

16 000 kg steam/h

SAACKE gas

GS125-30

37

Water Boiler House

2006

SCHATTDECOR Sp. z o.o. Tarnowo Podgórne

VIESSMANN 285 kW –

1 set

VIESSMANN 105 kW –

 1 set

390 kW

RIELLO

RS 28 TC gas

38

Process installations

2005

Zakłady Mięsne „BARTEK“ w Kłosowicach

Water process installations of 830C; 550C and 400C.

Water process installations of 550C and 25 bar.

Steam process installation.  Compressed air process installations for scorching & dehairing machine and for slaughterhouse offal pneumatic conveying TAJFUN.

-

-

39

Steam Boiler House
&
Process installations

2005

Fabryka Tektury TFP Sp. z o.o. Dziećmierowo k/Kórnika

 

LOOS UL-S 8000/16

8000 kg steam/h

WEISHAUPT

 RG 70

gas

40

Steam Boiler House

(development)

2005 / 2006

Fabryka Papieru „Malta-Decor” A.G. Zakład w Rudawie

 

VIESSMANN

12 000 kg steam/h

WEISHAUPT

RGL 70

gas

41

Steam Boiler House
&
in-site water purification plant 270 m3/h

2006 / 2007

Kompania Piwowarska A.G. Poznań

LOOS UL-SIE 18 t steam/h x 3

54000 kg steam/h

WEISHAUPT

 WK x 3

gas/oil

42

Process installation of paper manufacture

2007

Fabryka Papieru „Malta-Decor” A.G. Zakład w Poznaniu i Zakład w Rudawie

Steam condenser pipelines of DN 200 and smaller for paper facilities made of China

-

-

43

Amic-resisting installation

 

2008

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Process installation for  two  1 200 l/sec efficient  ATLAS COPCO compression  generators & four  Domnik Hunter PNEUDRI air dryers.

-

-

44

Process installations
for
paper production

2008

Fabryka Papieru „Malta-Decor” A.G.

Poznań

Steam condenser system installation for MP3. Steam site assembly for steam boiler house to MP3 workshop.

-

-

45

Steam Boiler House
&
 hot water return supply pipeline exchange

2007

Wielkopolskie Przedsiębiorstwo Przemysłu Ziemniaczanego A.G. Strzałkowo-Staw

LOOS UL-S-IE 5000 x 16

5000 kg steam/h

WEISHAUPT

gas/oil

46

Steam Boiler House

2009

Gospodarstwo Rolno-Hodowlane

GĄSIOREK – FARM

Czerniejewo

Steam generator LOOS DF 1500

1,5 t steam/h

 

WEISHAUPT

gas/oil

47

Process installations

2009

„PRISMADECOR” Sp. z o.o. Głuchołazy

In-site net & gas installation for paper production facilities

-

-

48

Gas Boiler House

2009

Akademia Ekonomiczna

Poznań

 

VIESSMANN

100 kW

GIERSCH

gas

49

Process installations

         2010

Okręgowa Spółdzielnia Mleczarska w Czarnkowie. Zakład Produkcyjny w Chodzieży.

Steam generator & condenser for spray drying tower for powder milk production

-

-

50

Water Boiler House

2010

GESTAMP Polska Sp. z o.o

Września

Tłocznia blach karoseryjnych

Expansion heating system. Water boiler LOOS UT 1400 X  6 UNIMAT installation.

 

1400 KW

WEISHAUPT

gas

51

Process installations

2009

NORDENIA  Sp. z o.o.

Dopiewo

Thermal oil installation supplying printing machine

-

-

52

Steam Boiler House

 

2009

BOLS Sp. z o.o.

Oborniki

LOOS UL-S IE

4000 X 10

4 t steam/h

WEISHAUPT

gas

53

Process installations

          2006

Kompania Piwowarska  A.G.

Poznań

Compressed  air installation of capacity

15 000 m3 /h for processing and beer manufacturing.

-

-

54

Steam Boiler House

 

2007 / 2008

ICT Poland Sp. z o.o.

Kostrzyn nad Odrą

Expansion heating system. Water boiler

 LOOS  ULS-IE 

22 000 x 20

22 t steam/h

WEISHAUPT

gas

55

Process installations

       2010/2011

PRISMADECOR Sp. z o.o.

Głuchołazy

Cooling water system installation for printing machines  PML6

-

-

56

Process installations

2010

Gospodarstwo Rolno – Hodowlane

GĄSIOREK – FARM

Czerniejewo

Process installation related to fur animal food manufacture & transportation machines.

-

-

57

Thermal Oil Boiler House

2008

Odazotownia Grodzisk

Polskie Górnictwo Naftowe

i Gazownictwo A.G.

HOVAL

1800 kW

Riello

gas

58

Steam Boiler House

2008 / 2009

AQUILA Radomsko Sp. z o.o.

LOOS UL-S IE

8000 x 18

8 t steam/h

WEISHAUPT

gas

59

Steam Boiler House

2009 / 2010

REM A.G. Nowogard

Vitomax 200 HS M235

5 t steam/h

Riello

gas / LPG

60

Water Boiler House

2009

COLSON Sp. z o.o. Komorniki

Brötje Eurocondens SGB 120C Gz50 &  radiant  heating system Winterwarm  using gas

170 kW

gas

61

Steam Boiler House

2009

Ali Baba Kebab Poznań

JUMAG

240 kg steam/h

Riello

oil

62

Process installations

2009

UNIQ LISNER Sp. z o.o. Poznań

Compressed air with drier produced by PARKER HANIFINN.

-

 

-

 

63

Process installations

2009

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Assembly of two air cooling units produced by PARKER with freezing water installation from cooling station to compressor room.

-

-

64

Pro-environmental installation

2009

„Malta-Decor” A.G. Poznań

Pro-environmental installation of air system reduction targeted burning

-

-

65

Process installations

2009

Sławski Zakład Przetwórstwa Mięsa  i Drobiu „Balcerzak I”  Sp. z o.o. Sława –Wróblów

Assembly of heating thermal centres  with a capacity of 2 MW

-

-

66

Process installations

2009

UNILEVER POLSKA A.G.

Oddział  Żywności  Poznań

Anti-corrosive technological water pipeline installation welded for new, mayonnaise production line.

-

-

67

Process installations

2009

Zespół Elektrowni

 Pątnów-Adamów-Konin A.G.

Replacing 3 pcs. of oil pumps on the block

No. 6 in power station PAK

-

-

68

Steam Boiler House

(development)

2010

Zakłady  Mięsne

 ŁMEAT-ŁUKÓW  A.G.

Zakład Produkcyjny „Dolina Noteci” w Polanowie gm.  Wyrzysk

VIESSMANN

VITOMAX 200  HS

3,8 t steam/h

DREIZLER

gas

69

Technical project.

Process installations.

Control Instrumentation & Automation

2010

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Palm oil installation and by-pass units, such as vapour , condensate, air, nitrogen, water units.

 

Design & execution of automation and control the unloading process and storage tanks.

-

-

70

Technical project & process installations.

2010

INDYKPOL A.G.

Olsztyn

Spray-evaporative condenser installation L=380 m

DN 150 & DN 80

-

-

71

Technical project & process installations

2010

PROFI-ENAMEL

Wronki

Granulate transport technological installation and foaming agent injection and new forms of new vapour, air, condensate, vacuum and cooling water pipeline system.

-

-

72

Steam Boiler House

(development)

2010

LATTERIA TINIS

Rzepin

VIESSMANN

VITOMAX  200 HS

2,9 t steam/h

RIELLO

gas/light oil

73

Technical project & process installations

2011

AQUILA  WRZEŚNIA  Sp. z o.o.

Zakład we Wrześni,

ul. Objazdowa

spray-evaporative condenser installation for corrugators.

Boiler house  extension.

-

-

74

Technical project & thermal oil boiler house assemble

2011

Przedsiębiorstwo Produkcyjno –

Konsultingowe    ADOB

Poznań

FERROLI

400 kW

RIELLO

light oil

75

Process installations

2011

SCHATTDECOR Sp. z o.o.

Głuchołazy

Gas installation for laminate unit with heating – ventilation unit. Cooling system for laminator cylinders installation.

-

-

76

Technical project & process installations

2011

KRONOPOL Sp. z o.o.

Żary

Thermal oil system for MP2 press. Installation of pumps.

-

-

77

Valves,Control Instrumentation & Automation

2011

VOLKSWAGEN  POZNAŃ

Poznań

Spray paint cabin’s modernization. Softweare & control of cabins

-

-

78

Process installations

2011

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Oil fryers and steam boiler renovation. Soda lye and nitrogen acid installation unit.

-

-

79

Process installations

2011

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Processing water installation and public water system connection.

-

-

80

Valves, Control Instrumentation & Automation

2011

Kompania Piwowarska SA

Browary Książęce  TYCHY

Oxygen regulators installation in burners combustion system in the steam boiler station.

-

-

81

Valves,Control Instrumentation & Automation

2011

Kompania Piwowarska  SA

Browary Książęce  TYCHY

Natural gas and bio-gas co-burning installation in the steam boiler station.

-

-

82

Valves,Control Instrumentation & Automation

2011

AQUILA WRZEŚNIA Sp. z o.o.

Września, ul. Objazdowa

Oxygen regulators installation in burners combustion system in the steam boiler station.

-

-

83

Process installations

2011

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Condensate installation in the pasta production area.

-

-

84

Process installations

2011

Kompania Piwowarska  A.G.

Poznań

Industrial sewage averaging device installation.

 

 

85

Technical project & process installations

2011

Kompania Piwowarska  A.G.

Poznań

Heat recovery from steam boiler station of 54 steam tons /h.

-

-

86

Technical project & process installations

2011

Kompania Piwowarska  A.G.

Poznań

Media measurement system: beer, technological steam, water, carbon dioxide, condensate, compressed air.

-

-

87

Technical project & process installations

2011

Kompania Piwowarska  A.G.

Poznań

Diatomaceous earth tanks transition.

-

-

88

Technical project & process installations

2011

AMICA SA

Wronki

Compressed  air installation

-

-

89

Process installations

2012

NORDENIA Sp. z o.o. Dopiewo

Thermal oil installation dedicated for power supply of laminator and subsequent flexographer unit

-

-

90

Process installations

2012

PEC  WRZEŚNIA A.G.

DALKIA

Września

Cogeneration system installation produced by CATERPILLAR of the capacity 2,5MW

-

-

91

Technical project & process installations

2012

UNIQ LISNER Sp. z o.o. Poznań

Steam supply hub for power system of refreezing unit of fish processing.

 

-

-

92

Process installations

2012

FARMUTIL HS A.G. Śmiłowo

64-810    Kaczory

ul. Przemysłowa  4

Measurement system of steam boiler station.

(steam and condensate)

-

-

93

Process installations

2012

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Connecting to the media filling & packaging machine - SIG Combibloc, Bag In Box and pasteurizer Tetra Pack.

-

-

94

Process installations

2012

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Anti-corrosive technological sewage pipeline installation welded for new cooking unit SILO.

-

-

95

Process installations

2012

UNILEVER POLSKA A.G. Oddział Żywności Poznań

Unload of sterilizer manufactured by Emmepiemme srl and its installation through the side elevation.

Sterilizer connection to the supplies and their communication to the aseptic tank.

-

-

96

Process installations

2012

Kompania Piwowarska A.G. Poznań

Provision, assembly and launch of four systems dedicated for clarity measurement of sweet wort in brewhouse.

 

 

97

Valves,Control Instrumentation & Automation

2012

KRONOSPAN Szczecinek

Sp. z o.o.

Szczecinek ul. Waryńskiego 1

Changing the security automation and control  system of  the boiler LOSS 1 type  ZFR  25000

-

-

98

Process installations

2012

Cargill Animal Nutrition

CARGILL (POLSKA) Sp. z o.o.

64-120 Krzemieniewo

ul. Dworcowa 167

Modernization of steam and condensate installation in the steam boiler house.

-

-

99

Process installations

2012

NORDENIA  POLSKA POZNAŃ Sp. z o.o.

Dopiewo,   ul. Wyzwolenia 34/36

Thermal oil installation dedicated for power supply of laminator and subsequent flexographer unit

-

-

100

Process installations

2012

FARMUTIL HS A.G. Śmiłowo

64-811 Kaczory

ul. Przemysłowa  4

Modernization of steam installation supplying destructors of animal fat manufacturing and meat & bone meal

-

-

101

Process installations

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Provision, assembly and launch of water system installation of deoxidized water.

-

-

102

Process installations

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Installation of beer waste disposal tank.

-

-

103

Process installations

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Process engineering installation of REDS beer.

-

-

104

Process installations

2012

UNIQ LISNER Sp. z o.o. Poznań, ul. Strzeszyńska 38/42

Installation of CIP in the new manufacturing line of fish proceeding.

-

-

105

Technical  expert opinion

2012

VOLKSWAGEN POZNAŃ

Sp. z o.o.

ul. Warszawska 349

Extensiveleak testthe gas installation

-

-

106

Gas Boiler House

2012

Przedsiębiorstwo Produkcyjno–

Konsultingowe ADOB Sp. z o.o.

Poznań, ul. Kołodzieja 11

Modernization of thermal oil installation the steam oil boiler house.

Supply of evaporator of W59 thermal oil.

FERROLI

400 KW

 RIELLO

light oil

107

Container  thermal oil boiler house

2012

NAFTAN Sp. z o.o.

Oleksze 21

17-106  ORLA

Container thermal oil boiler house supply including technical installation approach design of paraffin decontamination.

Boiler  OPX1000

1,163 MW

light  oil /  LPG

108

Brewhouse department

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Turnover of water pipe system installation and condensate.

-

-

109

Filtration department

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Installation of valves dedicated for beer continuous intake for filtration.

 

-

-

110

Compressor room

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

 Installation of heat exchangers of air driers in compressor room

 

-

-

111

Bottling  room

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Turnover of CIP pipe system installation in the bottling room.

 

-

-

112

Technological installations

2012

KOMPANIA PIWOWARSKA A.G.

Poznań, ul. Szwajcarska 11

Installation of antyscuffing system of bottles wash system.

-

-

113

Process installations

2012

UNILEVER POLSKA  A.G.

Oddział Żywności, Poznań,

ul. Bałtycka 43

Installation of water recovery for „effluent pretreatment plant” of sewage.

 

-

-

114

Process installations

2012

UNILEVER POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Media connecting  to the aseptictank

-

-

115

Process installations

2012

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Culinary steam installation.

-

-

116

Process installations

2012

UNILEVER POLSKA  A.G.

Oddział Żywności Poznań,

 ul. Bałtycka 43

Transfer of wash plant trolleys and media installation.

 

-

-

117

Steam Boiler House

2013

SCHATTDECOR Sp. z o.o.

Tarnowo Podgórne

Steam generator

YUMAG

560 kg steam/h

WEISHAUPT/gas

118

Process installations

2013

SCHATTDECOR Sp. z o.o.

Tarnowo Podgórne

Nitrogen pipeline DN50, 230 m, of the flow capacity of 633Nm3 /h for inerting purposes for the needs of the production process

-

-

119

Process installations

2013

KGHM Polska Miedź A.G.

Oddział Huta Miedzi „Głogów”

Głogów, ul. Żukowicka 1

Design and construction of the oil supply system for the installation of the third heating oil preheater for the Plant’s Fuel Station. Processing capacity 12.5 Mg/h.

-

-

120

Process installations

2013

Kompania Piwowarska SA

Poznań

Filtracja

Connecting of heat exchanger beer/ammonia at the filtration department.

-

-

121

Process installations

2013

PGNiG Zielona Góra

FX Warszawa

Kopalnia gazu ziemnego- ośrodek grupowy

Treatment system for natural gas in the Lisewo natural gas mine.

-

-

122

Technological line

 

2013

VOLKSWAGEN POZNAŃ

Sp. z o.o.

ul. Warszawska 349

Overhaul of the KTL drying line.

-

-

123

Technological line

 

2013

VOLKSWAGEN POZNAŃ

Sp. z o.o.

ul. Warszawska 349

 

Installation of manholes on the FL and CC drying lines.

-

-

124

Technical project & process installations

2013

KRONOPOL ŻARY

Sp. z o.o.

Żary

Thermal oil system for MP2 press. Installation of pumps.

-

-

125

Steam Boiler House

2013

LISNER Sp. z o.o.

Poznań, ul. Strzeszyńska

2 boilers  U-MB  of  LOOS/BOSCH

2 x 2 tons steam/h

WEISHAUPT

gas/oil

126

Process installations

2013

LISNER Sp. z o.o.

Poznań, ul. Strzeszyńska

Automatic marinade preparation, storage and distribution station for herring production line, together with a washing system. Dosing of liquid and powdered ingredients, mixing and heating.

-

-

127

Water Boiler House

2013

LAFARGE KRUSZYWA i BETON Sp. z o.o.

Wytwórnia betonu

Wysogotowo, ul. Grzybowa

 

Renovation ofhot water boiler
anda gas burner

470 kW

RIELLO

gas

128

Process installations

2013

Bonduelle Polska Sp. z o.o.

Zakład Produkcyjny

ul. Kilińskiego 11

88-140 Gniewkowo

Modernization of the boiler supplied steam generators CLAYTON 10 tons of steam / h x 2 sets

-

-

129

Technical project.

Process installations.

Control Instrumentation & Automation

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Design and execution of the heat recovery system from Atlas Copco compressors Q=360 kW.

Instrumentation, process controls and automation – control system for the heat distribution centre.

-

-

130

Anti-corrosive process installations

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Execution of process systems made of stainless steel:

- brine system

- ice water system

- process water system

- process steam system.

-

-

131

Process installations & construction work

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Execution of the central heating system DN125 and the hot service water system with the use of pre-insulated pipes.

-

-

132

Process installations & construction work

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Execution of the delivery sewage line DN200 for the new sewage pre-treatment plant.

-

-

133

Technical project.

Stainless steel process installations.

Control Instrumentation & Automation

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Design and execution of the stainless steel process system; design and execution of instrumentation, process controls and automation for the system for water recovery from the mixers.

-

-

134

Stainless steel process installations

2013

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Installation and connection of utilities to container washing facility. A stainless steel system.

-

-

135

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Delivery and installation of flue gas ducts DN 2000 for the regenerative thermal afterburner (RTO) system PLM 7.

-

-

136

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Internal gas supply system for process equipment (painting unit 4000 kW, air heaters 52 kW x 4, steam generators YUMAG 320kW x 2 and air handling units 180 kW x 4).

-

-

137

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Installation of heater in a new hall for the PLM7.

-

-

138

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Cooling system for the PLM7 machine.

-

-

139

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

System for heat recovery from flue gases downstream of the regenerative thermal afterburner RTO, Q = 800 kW.

-

-

140

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Cooling system based on absorptive unit Q=560 kW

and cooling tower

Q = 1500 kW.

-

-

141

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Internal process steam distribution system

p= 8 bar.

-

-

142

Process installations

2013

SCHATTDECOR Sp. z o.o.

Tarnowo Podgórne

ul. Sowia  10

Cooling system for the PMD 42 machine. Q= 330 kW.

(chiller and drycooler)

-

-

143

Process installations

2013

SCHATTDECOR Sp. z o.o.

Zakład  w Głuchołazach

ul. gen. Andersa 1

Delivery and installation of flue gas ducts DN 1400 for the regenerative thermal afterburner (RTO) for PLM5 and PLM6.

-

-

144

Process installations

2013

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo, ul. Wyzwolenia

Delivery and installation of solvent glue supply system for the gluing machine.

-

-

145

Process installations

2014

„Malta-Decor” A.G. Poznań

Upgrade of supply of the MP-1 machine. New steam and condensate systems.

-

-

146

Heat recovery process installation

2014

SCANENERGI SOLUTIONS A/S

IMPERIAL TOBACCO

Tarnowo Podgórne

Heat recovery system. System for heating of supply water to ZWZ.

-

-

147

Heat recovery process installation

2014

SCANENERGI SOLUTIONS A/S

IMPERIAL TOBACCO

Tarnowo Podgórne

System for heat recovery from condensate of the ESS system.

1 200 kW

-

148

Steam/condensate process installations (technical project & assemble)

2014

FARMUTIL HS  A.G.

Śmiłowo

64-811 Kaczory

ul. Przemysłowa  4

Steel, mobile construction of the steam bridge ( layout and installation).

Steam supply DN 150 and  condensate outlet to the new meat & bone floor drier

 (layout and installation).

-

-

149

Process installations

2014

Xylem Water Solutions Polska Sp. z o.o.

AQUANET  Aglomeracja

Mosina – Puszczykowo

Delivery and technological installation of the potable water ozoning for the city of Poznań (stainless installations DN 25 – DN 150 ).

-

-

150

Process installation at a tissue paper manufacturing plant

2014

ICT Poland Sp. z o.o.

Kostrzyn nad Odrą

ul. Włoska  3

Exchange of cylinders and guide rings in HOOD air heater ramping chambers of MP11 machine

-

-

151

Process installations

2014

SCHATTDECOR Sp. z o.o.

Zakład w Głuchołazach

ul. gen. Andersa 1

Varnish and raw material process installation for manufacturing furniture laminates, with a selection and installation of modern CORIOLIS metering and dosing systems – 32 receiving points

-

-

152

Compressed air system

(Concept, detailed design, implementation)

2014

ARDAGH GLASS A.G.

63-800 Gostyń

ul. Starogostyńska 9

Construction of a compressed air system at a plant, from DN 100 to DN 450

-

-

153

Process installations

2014

LISNER Sp. z o.o.

Poznań, ul. Strzeszyńska

Zakład w Kaliszu

Installation of the GA VSD 15 FF compressor by ATLAS COPCO, with a capacity of 2.91 m3/min, together with a tank and auxiliary system in a compressor station.

-

-

154

Process installations

2014

KRONOPOL ŻARY Sp. z o.o.

68-200 Żary

ul. Serbska  56

Construction of a medium-pressure gas path for the burner of a vertical drying station (h=30m)

-

-

155

Process installations

2014

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Pressure sewer system for process sewage: DN200 (welded PP), DN80 (INOX) for an in-house sewage treatment plant.

-

-

156

Process installations

2014

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Alternate distribution and automatic reversal system for vegetable oils: soybean/sunflower/rape. Palm oil distribution system. Auxiliary systems: oil tank heating system, process steam, nitrogen, compressed air, process piping system. Tank relocation:

3 x 50 m3. Construction works and electrical systems at the oil pumping station.

-

-

157

Industrial boiler house

2014

ABP Poland Sp. z o.o.

62-045 Pniewy

ul. Wspólna  1

Re-launch of a steam boiler station after a 6 years' shutdown.

LOOS U-HD

1,3 MW x 2

WEISHAUPT

gas and

gas/oil

158

Concept, detailed design and construction of a process system and industrial boiler house together with relevant automatic systems

2014

AQUILA BRZEG Sp. z o.o.

62-300 Września

ul. Objazdowa 6a

 

Cardboard production plant in Skarbimierz/Brzeg

Construction of a steam boiler house. Construction of installations for the cardboard machine.

Construction of relevant installations at the cardboard machine room. Construction of a compressor station with relevant systems, construction of a glue laboratory with relevant systems. Construction of steel supporting structures for pipelines.

Design and construction of automatics and control systems.

Start-up.

8 tons of steam/h

WEISHAPUT

gas

159

Automatics and control systems

2014

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Replacement of automatics and control systems for vegetable oil installations: soybean, sunflower, rape and palm.

-

-

160

Process installations

2014

VOLKSWAGEN POZNAŃ

Sp. z o.o.

Poznań

ul. Warszawska 349

Inspection and adjustment of 68 burners during shutdown of a coating station.

-

-

161

Process installations

2014

VOLKSWAGEN POZNAŃ

Sp. z o.o.

Poznań

ul. Warszawska 349

Inspection and leak testing of a 19 km gas system in Z1 and Z4 plants of the VW Group

-

-

162

Process installations

2014

Przedsiębiorstwo Produkcyjno–

Konsultingowe ADOB Sp. z o.o.

Poznań, ul. Kołodzieja 11

Zakład we Wrocławiu

Transfer of steam and water piping.

-

-

163

Boiler House

2014

Instytut Ochrony Roślin

Poznań

ul. Miczurina 20

Modernization of a boiler house and boiler automatic systems.

PAROMAT SIMPLEX

895 KW x 2

WEISHAPUT

gas

164

Process installations

2014

FARMUTIL HS  A.G.

Śmiłowo

64-813 Kaczory

ul. Przemysłowa 4

Installation of gas measurement systems for waste disposal cost optimisation.

-

-

165

Process installations

2014

UNILEVER

POLSKA  A.G.

Oddział Żywności Poznań,

ul. Bałtycka 43

Water supply and drainage systems in a new microbiology and physical chemistry laboratory.

-

-

166

Process installations

2015

ARDAGH  GLASS A.G.

63-800 Gostyń

ul. Starogostyńska 9

Construction of gas network from the pressure regulating and metering station to the production hall

-

-

167

Design and execution of process installation as well as control and measurement instruments and automation

2015

SCHATTDECOR Sp. z o.o.

Tarnowo Podgórne

ul. Sowia 10

 

Zakład w Głuchołazach

ul. gen. Andersa 1

Raw material and paint installation with automatics and cabling for 5 new tanks in the raw material and paint warehouse.

-

-

168

Design and execution of control and measurement instruments and automation

2015

SCHATTDECOR Sp. z o.o.

Tarnowo Podgórne

ul. Sowia 10

 

Zakład  w Głuchołazach

ul. gen. Andersa 1

Comprehensive automatic systems, control systems as well as paint and raw material data archiving systems along with metering, software configuration and start-up.

-

-

169

Process installation as well as control and measurement instruments and automation

2015

LISNER Sp. z o.o.

Poznań, ul. Strzeszyńska

Extension of the colouring solution system along with software and technological process control system.

-

-

170

Process installations

2015

KRONOPOL ŻARY Sp. z o.o.

68-200 Żary

ul. Serbska  56

Execution of strength calculations for an existing pipeline for the purpose of replacing heating oil medium with saturated vapour. Redevelopment of a thermal system including reconstruction of heat exchanger.

-

-

171

Process installations

2015

KRONOPOL ŻARY Sp. z o.o.

68-200 Żary

ul. Serbska  56

Execution of condensate system and sections of steam pipeline between adhesive production plant and MDF line.

-

-

172

Process installations

2015

ARDAGH  GLASS A.G.

63-800 Gostyń

ul. Starogostyńska 9

Disassembly of a gas pipeline on the pipe rack.  Execution of a compressed air collector.

-

-

173

Process installations

2015

VPK  Sp. z o.o.

62-300 Września

ul. Objazdowa 6a

 

Zakład w Radomsku

Installation of a new compressor, new compressed air tank, separator and filters. Connection of compressed air system and supply of pump system.

-

-

174

Automatics and control systems

2015

MALTA-DECOR

Poznań, ul. Wołkowyska

Execution of stationary water meters for 4 deep bore wells

-

-

175

Process installations

as well as control and measurement instruments and automation

2015

MALTA DECOR Sp. z o.o.

SWISS KRONO GROUP

Poznań, ul. Wołkowyska 28

Replacement of steam and condensate system for heads no. 1, 3, 4 and 5 of the MP1 paper machine.

Upgrade of MP1 control adjustment system

-

-

176

Process installations

2015

MONDI ŚWIECIE SA

86-100 Świecie

ul. Bydgoska  1

Removal of old exchangers for sodium hydroxide and backwash wastewater; installation of new exchangers.

Construction of 120 m stainless steel piping (DN250).

Construction of support structures and installation of shut-off valves and three-way valves (DN250).

-

-

177

Process installations-

cooling plant

2015

Poznań City Center

Centrum Handlowe przy dworcu PKP w Poznaniu

Replacement of a section of DN500, DN400 and DN200 cooling system. Removal of welding defects in existing joints together with joint replacement report and 100% radiographic inspection.

-

-

178

Process installations

2015

UNILEVER POLSKA SA

Oddział Żywności

Poznań

ul. Bałtycka  43

Construction of raw water and treated water systems

-

-

179

Process installations

2015

UNILEVER POLSKA SA

Oddział Żywności

Poznań

ul. Bałtycka  43

Upgrade of in-house fire protection system

-

-

180

Process installations

2015

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Thermal oil system for printing machine no. 205.

 

 

181

Process installations

2015

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Execution of thermal insulation for thermal oil system together with exchangers and fittings in M205 machine

-

-

182

Design and construction of stainless steel process system along with control and instrumentation-related works

2015

SCHATTDECOR Sp. z o.o.

Zakład w Głuchołazach

ul. gen. Andersa 1

Execution of paint temperature control system.

Extension of cooling system for POLYTYPE system

-

-

183

Process installations

2015

ARDAGH GLASS SA

63-800 Gostyń

ul. Starogostyńska 9

Overhaul of compressed air system in compressor room no.3.

Overhaul of gas system from DN300 collector to pressure reducing station of W1 glass furnace.

-

-

184

Process installations

2015

GETINGE IC PRODUCTION POLAND Sp. z o..

62-064 Plewiska

ul. Szkolna 30

Construction of steam and condensate system in the Komorniki plant

-

-

185

Process installations

2015

ARDAGH GLASS SA

63-800 Gostyń

ul. Starogostyńska 9

Construction of the plant's gas system.Overhaul of gas connections to the production area and water boiler station.

-

-

186

Process installations-

pressure boosting station

2016

VOLKSWAGEN POZNAŃ

Poznań, ul. Warszawska

Dismantling of the entire water boosting station operating with deep-well pumps.New placement of Behncke bed filter and aerator.Replacement of the filter bed in new and old filters.Construction of new piping system including the replacement of multi-way valves.System start-up, measurement-taking and preparation of as-built documentation.

-

-

187

Design and execution of process installations as well as Control Instrumentation & Automation

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Process wastewater system, stainless version, welded (DN80-DN250) for a new building - M&F kitchen. Reconstruction of pumped process wastewater system in fire-safety version - butt welded (DN200) for a new building - M&F kitchen. System design.

-

-

188

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Compressed air system for a new packaging line.

-

-

189

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Nitric acid and sodium hydroxide system for a new M&F kitchen - stage 1.

-

-

190

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Vinegar system for a new M&F kitchen - stage 1.

-

-

191

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Chilled water, raw water, softened water, and compressed air systems for a new M&F kitchen - stage 1.

-

-

192

Design and execution of construction

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Stainless steel service platforms and decks for a new M&F kitchen - stage 1.

-

-

193

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Execution of three independent palm oil filtration systems with an automatic filtration case emptying system. Design and installation works, two automation systems. Design and execution of automation systems for a rapeseed oil filtration plant.

-

-

194

Design and execution of process installations as well as Control Instrumentation & Automation

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Execution of a cooling system for a colloid mill. Design and execution of automation systems for a colloid mill cooling system.

-

-

195

Design and execution of process installations

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Chilled water, vinegar, compressed air systems for a new M&F kitchen - stage 2.

-

-

196

Design and execution of process installations as well as Control Instrumentation & Automation

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Pumped condensate system in WII department. Design and execution works. Design and execution of automation systems for the condensate system.

-

-

197

Design and execution of construction

2016

UNILEVER POLSKA SA

Oddział Żywności

Poznań, ul. Bałtycka  43

Stainless steel service platforms for a new M&F kitchen - stage 2.

-

-

198

Industrial installations

2016

ARDAGH GLASS SA

63-800 Gostyń

ul. Starogostyńska 9

Modernization of compressor room no. 3. Replacement of compressors. Disassembly of existing piping and fittings. Construction of a new system.

-

-

199

Industrial installations

2016

PetRing PACKAGING Sp. z o.o.

ul. Przylep – Ogrodnicza 5

66-015 Zielona Góra

40 bar compressed air system for production equipment. Modernization of the compressor room including replacement of systems and compressors.

-

-

200

Building permit design

2016

Good Food Products Sp. z o.o.

ul. Skórzewska 21

60-185 Skórzewo

Building permit design for compressed air system. Main compressor room design. Design for compressor heat recovery system.

-

-

201

Building permit design

2016

SAINT-GOBAIN HPM SA Polska Sp. z o.o.

ul. Nortona 1

62-600 Koło

Building permit design for a container boiler room with gas system

-

-

202

Building permit design

2016

STOLZLE CZĘSTOCHOWA Sp. z o.o.

ul. Warszawska 347

42-209 Częstochowa

Building permit design for modernized compressed air system for production lines and glass furnace.

-

-

203

Design and execution of Control Instrumentation & Automation

2016

UNILEVER POLSKA SA Oddział Żywności

ul. Bałtycka 43

Poznań

Modernization of CIP automation systems.

-

-

204

Design and execution of Control Instrumentation & Automation

2016

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Design and execution of modernized automation systems for HDO 6.01-61 boiler; capacity 25000 kg steam/h. Manufacturer: STANDARD KESSEL. Execution of a power supply and control cabinet. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office.

25 000 kg steam/h

WKG 70/3-A WEISHAUPT

205

Design and execution of Control Instrumentation & Automation

2016

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Design and execution of a 400 kW generator for heat recovery from flue gases - type H1.3. Manufacturer: ENERGO-SPAW. The energy recovered from the flue gases of HDO 6.01-61 boiler is used for heating the air required for burning E gas in WKG 70/3-A burners. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office.

-

Heat recovery from flue gases of a steam boiler with a capacity of 25 t steam / h

206

Design and execution of Control Instrumentation & Automation

2016

SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach

ul. gen. Andersa 1

Design and execution of SCADA WinnCC visualization for a coating system.

-

-

207

Design and execution of Control Instrumentation & Automation

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Design and execution of automation for a condensate system.

-

-

208

Design and execution of Control Instrumentation & Automation

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Design and execution of a heating cable system in a process plant.

-

-

209

Design and execution of Control Instrumentation & Automation

2016

ABP FOOD Sp. z o.o.

ul. Wspólna 1

62-045 Pniewy

Design and execution of automation for process water preparation system in a high-temperature water boiler room.

-

-

210

Design and execution of Control Instrumentation & Automation

2016

SCHUR FLEXIBLE POLAND Sp. z o.o.

ul. Pilotów

62-006 Bogucin

Design and execution of automation for thermal oil system in thermal oil boiler room.

-

-

211

Process installations

2016

KRONOPOL ŻARY SWISS KRONO GROUP

ul. Serbska 56

68-200 Żary

Design and installation of a thermal oil system for a new HYMMEN press

-

-

212

Process installations

2016

SCHUR FLEXIBLE POLAND Sp. z o.o.

ul. Pilotów

62-006 Bogucin

Thermal oil boiler room and thermal oil system.

400 kW

RIELLO

213

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Installation of heat recovery system on vapors from thermal degassing tanks.

-

-

214

Process installations

2016

SAIPEM SA

ul. Fińska 1 Teren GAZOPORTU

72-400 Świnoujście

Repair of hypochlorite system at the LNG terminal.

-

-

215

Conceptual diagram

2016

EUROSERVICE Zakłady Przemysłu Tłuszczowego w Surochowie

ul. Piłsudskiego 3

00-078 Warszawa

Conceptual diagram for a tri-generation process: boiler room 20 t steam/h + 1MW cooling + 1.2 MW electricity. Idea diagram - extension proposal.

-

-

216

Building permit design and detailed design

2016

Unilever Polska Sp. z o.o.

Aleje Jerozolimskie 134

02-305 Warszawa

Design for Unilever Food Solutions. Design for balanced mechanical ventilation system. Design for interior reconstruction for Culinary Training Centre.

-

-

217

Process installations

2016

VOLKSWAGEN POZNAŃ Sp. z o.o.

ul. Warszawska 349

Poznań

Replacement of multi-way valves at Behncke iron removers.

-

-

218

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Replacement of DN 100 beer piping between beer valve facilities and DTP pump in the Filtration area.

-

-

219

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Installation of multi-way Tuchenhagen valves at deoxygenated water system for FREE beer.

-

-

220

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Replacement of DN350 hot water piping in the Brew House.

-

-

221

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Replacement of leaking DN150 hot water piping in the Brew House, in SUW EUWA area.

-

-

222

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Execution of aseptic connections for measurements.

-

-

223

Process installations

2016

Kompania Piwowarska SA

Szwajcarska 11

Poznań

Changing the location of sampling points in the Filtration area.

-

-

224

Process installations

2016

Fabryka Kształtek Styropianowych PROFI-ENAMEL

Wronki

Disassembly of steam dryers and dryer drainage systems. Disassembly of measurement automation.

-

-

225

Water heating plant

2016

GONVARI POLSKA

Września

ul. Działkowców Krajalnia blach karoseryjnych

Internal inspection and pressure test of LOOS boiler.

1 MW

WEISHAUPT

226

Steam heating plant

2016

LISNER Sp. z o.o.

Poznań

ul. Strzeszyńska

Preparation of boilers for internal surveillance inspection.

2 x 2 tons steam/h

WEISHAUPT gas/oil

227

Thermal oil heating plant

2016

FLEX FILMS EUROPA Sp. z o.o.

62-300 Września,

ul. Sikorskiego 48

Internal inspection and pressure test of a thermal oil boiler and separation tanks.

3 MW

-

228

Design and execution of process installations as well as Control Instrumentation & Automation

2017

UNILEVER POLSKA SA Oddział Żywności

Poznań

ul. Bałtycka 43

Execution of vinegar filtration system. Design and installation works, automation system.

-

-

229

Container heating plant and Control Instrumentation & Automation

2017

SAINT-GOBAIN HPM SA Polska Sp. z o.o.

62-600 Koło

ul. Nortona 1

Construction of a containerised water boiler room. 2 x VITOPLEX 200 Design and execution of boiler automation.

2 x 1 MW

RIELLO RS

230

Design and execution of Control Instrumentation & Automation

2017

GONVARRI Polska Sp. z o.o.

62-300 Września

ul. Działkowców Krajalnia blach karoseryjnych

Design and execution of a system limiting peak water consumption by water boiler room

1 MW

WEISHAUPT

231

Design and execution of Control Instrumentation & Automation

2017

MALTA DECOR SWISS KRONO GROUP

Poznań

ul. Wołkowyska

Design and execution of modernized ZFR boiler automatics for capacities up to 28,000 kg steam/h (LOOS). Execution of a new power supply & control cabinet. Upgrading of SCADA WinCC visualization for steam boiler room. Arrangements with the Central Laboratory of Technical Supervision and Technical Supervision Office.

-

-

232

Industrial installations. Cooling plant

2017

Centrum Handlowe AVENIDA POZNAŃ

Replacement of cooling system components in WSHP cooling plant - from DN200 to DN450.

-

-

233

Industrial installations

2017

Fabryka Tektury Falistej TFP Sp. z o.o. Zakład w Babimoście

Modernization of steam and condensate system for a Fosber corrugator.

-

-

234

Industrial installations

2017

Fabryka Tektury Falistej TFP Sp. z o.o. Zakład w Dziećmierowie k/Kórnika

Construction of steam feeding for a MASTERFLEX printing machine

-

-

235

Industrial installations

2017

SCHATTDECOR Sp. z o.o. Zakład w Głuchołazach

ul. Gen. Andersa 1

Construction of flue gas ducts to RTO3 flue gas treatment system.

-

-

236

Industrial installations

2017

Glaxo Smith Kline Pharmaceuticals S.A.

ul. Grunwaldzka 189

60-322 Poznań

Replacement of CH5 and CH6 chillers for the production building

2 x 950 kW

DAIKIN

237

Industrial installations

2017

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

Steam heating hub with a sterile filter.

~ 3000 kg steam/h

-

238

Water boiler house

2017

MARMITE Sp. z o. Zakład Produkcyjny w Łowyniu

ul. Szkolna 16

64-426 Łowyń

Internal revision and pressure test of VIESSMANN Turbomat – Duplex water boilers (2 units)

1.2 MW

1.5 MW

WEISHAUPT gas/oil

239

Industrial installations

2017

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Construction of a line for GMO soybean oil unloading and loading to rail tankers and tanker trucks. Construction of a soybean oil system in the pipe rack and storage tank area.

-

-

240

Industrial installations

2017

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Installation works in the boiler house during the summer downtime.

-

-

241

Industrial installations

2017

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

CKT Steam system modernization in the oxygen filters area.

-

-

242

Industrial installations

2017

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

DOC – 53 Replacement of shut-off fittings on ammonia systems.

-

-

243

Industrial installations

2017

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

CKT Steam system modernization in the oxygen filters area.

-

-

244

Engineering

2017

KRONOPOL ŻARY

SWISS KRONO GROUP

68-200 Żary, ul. Serbska 56

Technological documentation for thermal oil system for a KT9 press. Supporting structures design.

-

-

245

Compressed Air System Engineering

2017

Federal-Mogul BIMET S.A.

al. Grunwaldzka  481

80-953 Gdańsk

Design of a modernization of a wide-area compressed air system including modernization and selection of compressors.

Design of a compressor heat recovery system.

-

-

246

Industrial installations

2017

KRONOPOL ŻARY

SWISS KRONO GROUP

68-200 Żary, ul. Serbska 56

Construction of a thermal oil system and supporting structure for a HYMMEN press.

-

-

247

Industrial installations

2017

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Construction of a process installation of solvent glue to the dosing unit No. 2 in a flexographic machine.

-

-

248

Industrial installations

2017

Curtis Health Caps Sp. z o.o.

ul. Batorowska 52

62-081 Przeźmierowo

Design and construction of a service platform for a feeding tank with a gas removal unit. Design and construction of a „screw-mounted platform”.

-

-

249

Design and construction of a process installation; civil works

2017

Skanem Poznań Sp. z o.o.

Swadzim, ul. Poznańska 34b

62-080 Tarnowo Podgórne

Cooling water system.

-

-

250

Process installation

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Modernization of CIP drains in the Ohmic kitchen area.

-

-

251

Design and construction of a process installation; civil works

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Stainless steel process sewage system in the new packing hall area.

-

-

252

Design and construction of a process installation; civil works

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Stainless steel process sewage system in the Ohmic kitchen area.

-

-

253

Design and construction of a process installation

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Stainless steel systems: compressed air, process water, domestic water in the new packing hall area.

-

-

254

Design and construction of structures

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Stainless steel supporting structures and service platforms in the new packing hall area.

-

-

255

Design and construction of structures

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Service platform above a SIG dispensing and packing machine

-

-

256

I&C design and construction

2017

MALTA DECOR

SWISS KRONO GROUP

Poznań, ul. Wołkowyska 28

Modernization of the condensate pumps control system. Construction of a new supply and control cabinet. Modernization of SCADA WinCC visualization. Software changes to  SIEMENS S7-300 controller.

-

-

257

I&C design and construction

2017

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

Design and construction of automation system for the filtration water recovery unit

-

-

258

Steam boiler house

2017

ADM  Szamotuły Sp. z o.

ul. Chrobrego 29

64-500 Szamotuły

Revision of the heat recovery system

25 000kg

steam/h

WKG 70/3-A

WEISHAUPT

gas/oil

259

I&C design and construction

2017

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Construction of a nitrogen detection system in the production hall.

-

-

260

I&C design and construction

2017

MALTA DECOR

SWISS KRONO GROUP

Poznań, ul. Wołkowyska 28

Modernization of the control system for the permeate tank make-up water system, including water meters and dosing pumps.  Modernization of SCADA WinCC visualization. Software changes to SIEMENS S7-300 controller.

-

-

261

Water boiler house

2017

Marmite Sp. z o.o.

ul. Szkolna 16

64-426 Łowyń

Boiler house commissioning.

External revision with the assistance of the Office of Technical Inspection (UDT).

VIESSMANN Turbomat

2 units.

1.2 MW

1.5 MW

WEISHAUPT

gas/oil

262

Steam boiler house

2017

CEDC International Sp. z o.o.

ul. Kowanowska  48

64-600 Oborniki

Modernization of the permeate pumps control system in a S7-300 controller and SCADA WinCC.

4 tons

steam/h

WEISHAUPT

gas

263

Compressed air system

2017/2018

Samsung Electronics Poland Manufacturing Sp. z o.

ul. Adama Mickiewicza 52

64-510 Wronki

Construction of a compressor building and a compressor cooling system

-

-

264

Industrial installations

2017/2018

Farmutil HS

ul. Przemysłowa 4

64-810 Śmiłowo

Design and construction of steam and condensate system for a new process line of a continuous operation destructor

1 x 11320 kg steam/h

-

265

Design and construction of a process installation and I&C

2017/2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Construction of a soybean and rapeseed oil filtering system including a system for automatic emptying of filtration housings. Engineering, assembly and automation.

-

-

266

Design and construction of a process installation and I&C

2017/2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Construction of an unloading station for compressed nitric acid, including steel structures, ventilation system and acid pipelines.

-

-

267

Design and construction of a process installation

2017/2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Water and sewage system in a new physicochemical laboratory

-

-

268

Industrial installations

2018

Schattdecor Sp. z o.o.

ul. Sowia 10

62-080 Tarnowo Podgórne

Nitrogen system

940 Nm3/h

23,625 kW

-

269

Industrial installations

2018

Schattdecor Sp. z o.o.

ul. Sowia 10

62-080 Tarnowo Podgórne

Cooling hub

34 kW

-

270

Industrial installations

2018

Farmutil HS

ul. Przemysłowa 4

64-810 Śmiłowo

Construction of a steam, condensate and air connection to feather hydrolyser

-

-

271

Industrial installations

2018

Farmutil HS

ul. Przemysłowa 4

64-810 Śmiłowo

Replacement of a steam reduction pathway in the batch operation destructors line No. 6

-

-

272

Industrial installations

2018

Farmutil HS

ul. Przemysłowa 4

64-810 Śmiłowo

Modernization of the steam system at the batch operation destructors line No. 7.

-

-

273

Compressed air system

2018

Good Food Products Sp. z o.o.

ul. Szumin  15

62-080 Tarnowo Podgórne

 

Compressed air system for production purposes. Construction of a compressor building and compressed air mains. Compressor heat recovery system.

-

-

274

I&C design and construction

2018

SCHATTDECOR Sp. z o.o.

Zakład w Głuchołazach

ul. Gen. Andersa 1

A system for recovering thermal energy from flue gas downstream of the RTO3 regenerative thermal afterburner. Construction of the automation system; extension of a  SIEMENS  S7-300 controller.

-

-

275

I&C design and construction

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Safeguards for oil unloading systems. Construction of a control system in a S7-300 controller

-

-

276

I&C design and construction

2018

SCHATTDECOR Sp. z o.o.

ul. Sowia 10

62-080 Tarnowo Podgórne

Construction, connection and commissioning of the automation system for the nitrogen preheating unit.

-

-

277

I&C design and construction

2018

SCHATTDECOR Sp. z o.o.

ul. Sowia 10

62-080 Tarnowo Podgórne

Construction, connection and commissioning of the ice water automation system for the IOT.

-

-

278

PLC programming

2018

SCHATTDECOR Sp. z o.o.

Zakład w Głuchołazach

ul. Gen. Andersa 1

Migration of the design of a SIEMENS S7-300 controller to a new version of TIA PORTAL V14.

-

-

279

I&C design and construction

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Modernization of a compressed air supply system for the M&F.

-

-

280

I&C design and construction

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Construction, connection and commissioning of the automation system for the M&F oil filtration unit. Programming of a SIEMENS S&-300 controller.

-

-

281

I&C design and construction

2018

Good Food Products Sp. z o.o.

ul. Szumin  15

62-080 Tarnowo Podgórne

 

Construction, connection and commissioning of the automation system for the compressor heat recovery unit. Programming of a SIEMENS S7-300 controller.

-

-

282

Process installation

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Diagnostics and repair of the afterburner system.

-

-

283

Thermal oil boiler house

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Repair and commissioning of the thermal oil boiler after a coil failure.

Boiler HTT

2250 kW

WEISHAUPT

gas

284

Process installation

2018

NORDFISH Sp. z o.o.

ul. Szkolna 60

78-122 Charzyno

Design, construction, connection and commissioning of automation (I&C) for the frying machine oil distribution and filtration system. Programming of a SIEMENS S7-1200 controller

-

-

285

Heating plant

2018

AQUILLA Radomsko Sp. z o.o.

ul. Przedsiębiorców 1

97-500 Radomsko

Construction, connection and commissioning of automation (I&C) for the heating plant. Programming a SIEMENS S7-300 controller

-

-

286

PLC programming

2018

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Installation works and boiler house S7-300 controller software update to TIA PORTAL version

-

-

287

Steam boiler house

2018

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Review of a heat recovery system

25 000kg

 of steam per hour

WKG 70/3-A

WEISHAUPT

gas/oil

288

Process installation

2018

VOLKSWAGEN POZNAŃ

Sp. z o.o.

ul. Warszawska 349

61- 060 Poznań

Review of burners in the painting unit

-

-

289

I&C design and construction

2018

SAINT-GOBAIN HPM Polska

Sp.z o.o.

ul. Norton 1

62-600 Koło

Remote boiler house monitoring

-

-

290

Industrial installation

2018

SAINT-GOBAIN HPM Polska

Sp.z o.o.

ul. Norton 1

62-600 Koło

Modernization of heating plants

-

-

291

Thermal oil boiler house

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Transfer of Babcock thermal oil boilers from Kutno to Dopiewo.

Modernization of boiler house control systems.

Modernization of boiler and burner automation system controls.

Approvals from CLDT and UDT

Programming of SIEMENS S7-300 controllers

Babcock Wanson

(2x2500kW)

Babcock Wanson

gas

292

Industrial installation

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Installation and measurement of paint tanks. 

-

-

293

Industrial installation

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Ethyl acetate.

Tank measurement and connection of instrumentation.

-

-

294

Steam boiler house

2018

MALTA DECOR

Poznań, ul. Wołkowyska 28

Zakład w Rudawie

Modernization of boiler security circuit. Design approval from UDT.

-

-

295

Industrial installation

2018

SWISS KRONO Sp. z o.o.

ul. Serbska  56

68-200 Żary

Replacement of heat exchangers on the MDF line, including connection to the steam condensate system.

-

-

296

Industrial installation

2018

SWISS KRONO Sp. z o.o.

ul. Serbska  56

68-200 Żary

Construction of hot water process installation, using its energy to heat the OSB-STELA drying plant.

-

-

297

Steam boiler house

2018

MALTA DECOR

SWISS KRONO GROUP

Poznań, ul. Wołkowyska 28

Internal revisions and pressure tests of steam boilers and steam generator

44 t of steam per hour

WEISHAUPT RGL 70

298

Steam boiler house

2018

ADM  Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Repair works in the boiler house during the plant’s maintenance downtime

2 x 25 000kg

 of steam per hour

WKG 70/3-A

WEISHAUPT

gas/oil

299

Industrial installation

2018

Power Engineering S.A.

ul. Gdyńska  83

62-004 Czerwonak

Construction of transformer oil supply system.

-

-

300

Compressed air system

2018

Samsung Electronics Poland Manufacturing Sp. z o.o.

ul. Adama Mickiewicza 52

64-510 Wronki

Construction of a compressor room and compressor cooling system. Modernization of a compressor room. Construction and installation works.

-

-

301

Compressed air system - design and construction

2018

SAINT-GOBAIN HPM Polska

Sp.z o.o.

ul. Norton 1

62-600 Koło

Compressed air system for production purposes. Construction of a compressor room and compressed air mains.

-

-

302

Vacuum system design

2018

SAINT-GOBAIN HPM Polska

Sp.z o.o.

ul. Norton 1

62-600 Koło

Design of a vacuum system including transfer of existing vacuum pumps.

-

-

303

Industrial installation.

Design and construction.

2018

ARDAGH GLASS SA

63-800 Gostyń

ul. Starogostyńska 9

Design and construction of a compressor heat recovery system.

-

-

304

Industrial installation.

Design and construction.

2018

Samsung Electronics Poland Manufacturing Sp. z o.o.

ul. Adama Mickiewicza 52

64-510 Wronki

Design and construction of a gas system including gas pressure reduction and metering unit for a new packing machine.

-

-

305

Industrial installation and structure

2018

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

ul. Wyzwolenia 34/36

Design and construction of a service platform for thermal oil preheating system at +230 cm, thermal oil Babcock boiler service platform at +216 cm; pump replacement in the production hall.

-

-

306

Industrial structure

2018

Bonduelle Polska S.A.

ul. Michała Drzymały 18,

62-073 Ruchocice

Design and construction of a flue gas heat recovery service platform at +230 cm.

-

-

307

Industrial installation

2018

Kompania Piwowarska S.A.

ul. Szwajcarska 11,

61-285 Poznań

Repair works at the filling plant

-

-

308

Industrial installation

2018

Coatreno Sp. z o.o.

ul. Obornicka 330,

60-689 Poznań

Replacement of fragments of process waste pumping system (steel and PE piping) at the premises of Wyborowa S.A.

-

-

309

Industrial installation

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Replacement of aseptic tank and its connection to process systems (CIP, product, steam, condensate)

-

-

310

Industrial installation

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Pressure tests of six autoclaves - preparation for internal review

-

-

311

Industrial installation

2018

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka  43

Modernization works in the mayonnaise production hall

-

-

312

Industrial installation

2018

ADM  Szamotuły Sp. z o.

ul. Chrobrego 29

64-500 Szamotuły

Disassembly / assembly and pressure test of a heat exchanger

-

-

313

Process installation

2018

NORDFISH Sp. z o.o.

ul. Szkolna 60

78-122 Charzyno

 

Design, construction and commissioning of the frying machine oil distribution and filtration system.

-

-

314

In-house gas station

2018

SAINT-GOBAIN HPM Polska

Sp. z o.o.    

ul. Norton 1

62-600 Koło

Assembly of gas station with two tanks 2 x 10 m3. A “design & build” project.

-

-

315

Industrial installation

2018

AQUILLA Radomsko Sp. z o.o.

ul. Przedsiębiorców 1

97-500 Radomsko

Installation of a central heating / steam / water heating plant (800 kW)

-

-

316

PLC programming

2019

MALTA DECOR

60 – 101 Poznań

ul. Wołkowyska 28

Design of gas consumption visualization system. Programming changes in a SIEMENS S7-300 controller.

SCADA WinCC visualization

-

-

317

Water boiler house

2019

ABP FOOD POLAND

ul. Wspólna 1

62-045 Pniewy

Modernization of boiler automation and security circuits. Automation approvals from CLDT and UDT.

ASTEBO GmbH

(1400 kW)

DUNPHY

Gas

318

PLC programming

2019

CEDC International Sp. z o.o.

ul. Kowanowska  48

64-600 Oborniki

Update of SIEMENS SCADA WinCC 7.4 visualization

-

-

319

Industrial installation

2019

Bonduelle Polska S.A.

ul. Michała Drzymały 18,

62-073 Ruchocice

Heat recovery from steam boiler flue gas.

Design, construction, connection and commissioning of I&C. Programming of a SIEMENS S7-300 controller.

HOCON

(3500 kg/h)

WEISHAUPT

gas

320

Industrial installation

2019

Marmite Sp. z o.o.

ul. Przemysłowa 4, Zakrzewo

62-070 Dopiewo

Zakład w Łowyniu

Construction of an in-tank heating oil metering system

-

-

321

Industrial installation

2019

BIOWATT SA

61 - 006 Poznań

ul. Blacharska  2

Construction of a methane fermentation biogas system for ZGO JAROCIN

-

-

322

Process installation in a cooling engine room

2019

INSTAL – LUBLIN Sp. z o.o.

ul. Anny Walentynowicz 9

20 – 328 Lublin

for

AVENIDA POZNAŃ Sp. z o.o.

Replacement of piping in cooling engine room (DN500, DN400, 300DN and DN200). Removal of welding defects in existing welds, including replacement reports and weld X-ray testing (100% of welds)

-

-

323

Industrial installation

2018/2019

MONDI POZNAŃ Sp. z o.o.

62-070 Dopiewo

20 – 328 Lublin

ul. Wyzwolenia 34/36

Installation of paint and solvent tanks; construction of flammable liquids storage and distribution system. Registration with the Office of Technical Inspection (UDT).

-

-

324

Industrial installation

2018/2019

Johnson Controls International Sp. z o.o.

ul. Krakowiaków 50

02-255 Warszawa

Welding works on the cooling system at TOMS POLSKA Sp. z o.o. (a food plant in Nowa Sól, Poland)

-

-

325

Industrial installation

2019

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka 43

Installation of linear drainage and construction of acid-resistant process sewage system in production halls and in buildings “W” and “E”

-

-

326

Industrial installation

2019

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka 43

Installation of two rapeseed oil storage tanks (100 cu.m. in total), incl. connection to the existing system. Engineering, construction, welding and I&C. Programming of an S7-300 controller.

-

-

327

Industrial installation

2019

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka 43

Installation of two 12% acetic acid storage tanks (36 cu.m. in total), incl. connection to the existing system. Engineering, construction, welding and I&C. Programming of an S7-300 controller.

-

-

328

Industrial installation

2019

UNILEVER POLSKA S.A.

Oddział Żywności Poznań

ul. Bałtycka 43

Installation of two storage tanks for aggressive substances (nitric acid and sodium hydroxide; 55 cu.m. in total), incl. connection to the existing system. Engineering, construction, welding and I&C. Programming of an S7-300 controller. Registration with the Office of Technical Inspection (UDT).

-

-

329

Industrial installation

2019

NORDFISH Sp. z o.o.

ul. Szkolna 60

78-122 Charzyno

Relocation of an oil filtration plant and exension of an oil distribution system. Engineering, welding, connection and commissioning of instrumentation and controls (I&C) Programming of an S7-1200 controller .

-

-

330

Industrial installation

2019

LISNER Sp. z o.o. Sp.k.

ul. Strzeszyńska 38/42

60-479 Poznań

Extension of a fish brine preparation station. Engineering and welding. Connection and commissioning of instrumentation and controls (I&C) Programming of an S7-300 controller.

-

-

331

Water boiler house

2019

SAINT-GOBAIN HPM Polska Sp. z o.o.

ul. Norton 1

62-600 Koło

Remote access to the boiler room via LAN

2 x 1 MW

WEISHAUPT gas

332

Boiler house

2019

ORZEŁ BIAŁY S.A.

ul. Harcerska 23

41-946 Piekary Śląskie

Development of a concept for heat recovery from lead refinement kettles.

10 refining kettles

KROMSCHRODER gas

333

Thermal oil boiler

2019

SWISS KRONO Sp. z o.o.

ul. Serbska 56

68-200 Żary

Air filtration and THZ boiler software upgrade. Engineering and commissioning. Programming of an S7-400 controller.

25 MW

SAACKE gas

334

Water boiler house

2019

SAINT-GOBAIN HPM Polska Sp. z o.o.

ul. Norton 1

62-600 Koło

Upgrade of circulation pomp controls.

-

-

335

Steam boiler house

2019

MALTA DECOR

60 – 101 Poznań

ul. Wołkowyska 28

Upgrade of water preheating in a ZZ feed tank. Installation and programing of the control system. Programming of an S7-300 controller.

49 t steam/h

WEISHAUPT

336

Industrial installation

2019

Johnson Controls International Sp. z o.o.

ul. Krakowiaków 50

02-255 Warszawa

Construction of a cooling system engine room for „Dolina Noteci Polanowo” plant

-

-

337

Steam boiler house

2019

MALTA DECOR

60 – 101 Poznań

ul. Wołkowyska 28

Zakład w Rudawie

Internal inspection of a LOOS boiler

25 t steam/h

WEISHAUPT

338

Industrial installation

2019

MALTA DECOR

60 – 101 Poznań

ul. Wołkowyska 28

Replacement of an intermediate pressure gas pipeline in the MP-4 mills hall

-

-

339

Industrial installation

2019

SWISS KRONO Sp. z o.o.

ul. Serbska 56

68-200 Żary

Installation of preinsulated DN 250 and DN 350 pipelines to the Stella drying plant.

-

-

340

Industrial installation

2019

BIOWATT SA.

61 - 006 Poznań

ul. Blacharska 2

Prefabrication of corrosion-resistant biotech system for Gniezno biogas plant.

-

-

341

Industrial installation

2019

Dolina Noteci

Zakład Produkcji Karmy dla Zwierząt

Polanowo 27A

89-300 Polanowo

Repairs of cooling pipelines in the suspended ceiling area

-

-

342

Industrial installation

2019

Dolina Noteci

Zakład Produkcji Karmy dla Zwierząt

Polanowo 27A

89-300 Polanowo

Construction and installation of an additional feed water tank in the boiler house. Construction of a supporting structure for the tank.

-

-

343

Industrial installation

2019

Dolina Noteci

Zakład Produkcji Karmy dla Zwierząt

Polanowo 27A

89-300 Polanowo

Construction of a new process water, steam and condensate system for new autoclaves.

-

-

344

Water boiler house

2019

GONVARRI Polska Sp. z o.o.

62-300 Września

ul. Działkowców

Krajalnia blach karoseryjnych

Inspetion and pressure test of a LOOS boiler

1,4 MW

WEISHAUPT

345

Steam boiler house

2019

ADM Szamotuły Sp. z o.o.

ul. Chrobrego 29

64-500 Szamotuły

Repair works in the boiler house. Preparation for the production season.

-

-

346

Industrial installation

2019

Zakład Karny Zaręba

Leśna 4

59-800 Zaręba

Installation of preinsulated pipelines for the steam system.

-

-

347

Gas system

2020

Bridgestone Poznań Sp. z o.o.

ul. Bałtycka 65

61-017 Poznań

Construction-permit design and installation of an intermediate pressure natural gas connection point for a new regenerative afterburning system

-

-

348

Steam boiler house engineering

2020

Nutricia Sp. z o.o.

ul. Kobylińska 37

63-700 Krotoszyn

Construction-permit and working design for a steam boiler plant (2x7 tons of steam per hour)

2 x 7 t steam/h

WEISHAUPT

349

Steam boiler house

2020

Eden Springs Sp. z o.o.

ul. Fabryczna 1

62-065 Grodzisk Wielkopolski

Internal inspetion and pressure test of a steam boiler.

375 kW VIESSMANN

G3/1-EZD gas

350

Industrial installation

2020

AGRO-MONTAŻ INWESTYCJE Sp. z o.o. z siedzibą we Franku,

ul. Osiedlowa 5

83-260 Kaliska

Construction of a steam condensate system near steam ramp of a new and existing conditioner for pellet production.

-

-

351

Industrial installation

2020

Process Technology Strategic Consultancy LTD

Alloa Business Centre

Whins Road

Alloa

Clackmannanshire, FK10 3SA UK

Engineering and construction of a thermal oil system in the boiler plant and for an autoclave at ZOTEFOAMS PLC in Skarbimierz, Poland.

GekaKonus boiler THZ-S 13H
2 x 1510 kW

WN-G 30/1-A ZM-3LN WEISHAUPT

352

Industrial installation

2020

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

Redevelopment of an existing sterile and control air system. Redevelopment of an existing condensate and chlorinated water system and a transporter foaming system.

-

-

353

Industrial installation

2020

Kompania Piwowarska S.A.

ul. Szwajcarska 11

61-285 Poznań

Redevelopment of an existing beer pipeline near the monoblock. Replacement of a damper and filters in the ClO2 distribution system. Installation works in the PL6 line.

-

-

354

Industrial installation

2020

SAINT-GOBAIN HPM Polska Sp. z o.o.

ul. Norton 1

62-600 Koło

Design, construction permit, detailed engineering, as-built documentation and construction of an engine room for vacuum pumps and negative pressure system.

-

-

355

Industrial installation

2020

SAINT-GOBAIN HPM Polska Sp. z o.o.

ul. Norton 1

62-600 Koło

Detailed engineering for the modification of the thermal oil system for TRIO presses. Construction of a thermal oil system.

-

-

356

Steam boiler house

2020

MARCELIN MANAGEMENT Spółka z o.o.

ul. Polna 26

64-510 Wronki

Control system upgrade for condensate pumps and ZZ feed tank preheating. Launching and programming of a S7 -1200 controller.

U-LS 2600
U-HD 3200

GL 8/1-D
GL 9/1-D
gas